
Pontcysyllte Aqueduct
- UNESCO World Heritage
Interesting facts
- The mortar of the stone piers was mixed from lime, water and ox blood.
- Joints between the iron plates were packed with Welsh flannel and white lead mixed with fine iron borings.
- Before opening, the trough was left full of water for six months to prove it was watertight.
- The iron trough is not bolted to the arches beneath it; it rests on them, held in place by lugs cast into the plates.
- For maintenance it is drained by pulling a plug in one span, sending about 1.5 million litres cascading into the River Dee.
- The ironwork was cast by William Hazledine at his Plas Kynaston foundry in Cefn Mawr, a village beside the aqueduct.
- The foundation stone was laid on 25 July 1795, and the work took about ten years.
- Telford designed it under the supervision of William Jessop, the more experienced canal engineer of the Ellesmere Canal.
- When the canal was formally closed to navigation in 1944, the aqueduct survived because it supplied water to a reservoir at Hurleston.
- The name means the bridge of Cysyllte, a local township; the popular reading as a bridge of connections is a false etymology.
Why it is worth it
Thomas Telford did something no engineer had dared before: instead of a stone trough lined with clay โ the only way anyone had carried a canal across a valley until then โ he cast the whole watertight channel out of iron plates, 3.7 metres wide and 1.7 metres deep, and hung it 38 metres above the River Dee on eighteen hollow stone piers that taper toward the top to shed weight. He'd tested the idea on a smaller scale at Longdon-on-Tern first, then bet the Ellesmere Canal Company's money on it here. Sealing the iron joints was its own invention: the joints between the iron plates were packed with Welsh flannel soaked in a white-lead paste, then bolted tight โ homely materials for a structure of such daring.
The trough has no towpath railing on the canal side โ boats simply float past a sheer drop, with only a narrow raised path on the other edge for the horse. Two centuries of boaters have found this exhilarating or terrifying depending on temperament; it remains one of the most disorienting stretches of inland waterway anywhere, precisely because the water itself is the only thing between the gunwale and thin air.
At roughly ยฃ47,000, the project swallowed close to a tenth of the UK's entire annual output at the time โ a scale of public spending that's hard to imagine committing to a canal bridge today. It worked anyway: the trough Telford poured in 1805 is still the one boats float through now, still watertight, still the highest and longest navigable aqueduct in Britain, which is why UNESCO listed it in 2009 not as a ruin but as working infrastructure.
Getting there
5 km from Rhosllannerchrugog. Liverpool John Lennon Airport (LPL) is about 44 km away.
On these lists
From the encyclopaedia
The Pontcysyllte Aqueduct is a navigable aqueduct that carries the Llangollen Canal across the River Dee in the Vale of Llangollen in northeast Wales.
Wikipedia ยท CC BY-SA 4.0
52.97020, -3.08782per Wikidata