
Furka Cogwheel Steam Railway
Dampfbahn Furka-Bergstrecke
Interesting facts
- At nearly 18 km it is the longest railway line in Switzerland operated without electrification.
- It is often counted as the second-highest rail crossing in Europe, after the Bernina line in Graubünden.
- The original builder, the Brig-Furka-Disentis railway, went bankrupt in 1923, and a new company finished the line with help from neighbouring railways.
- The mountain section was electrified in 1942, so the steam trains running today restore a sight unseen for decades.
- The volunteer association behind the line has about 23 sections in Switzerland, Germany and the Netherlands and more than 7,500 members.
- The locomotive Weisshorn of 1902 stood on a plinth outside a school in Chur until local pupils donated it in 1988, on condition it ran again.
- The engines brought back from Vietnam were rebuilt at the Meiningen steam locomotive works in Germany and returned to service in 1993.
- Two larger engines built in the 1920s for Vietnam itself were also repatriated, rebuilt in Uzwil and returned to steam in 2018 and 2023.
- The summit tunnel had been squeezed out of shape by the pressure of the mountain and had to be rebuilt before trains could pass again.
- Since 2012 a special train has recreated the classic through journey from St. Moritz to Zermatt over the Furka, taking about twelve hours.
Why it is worth it
For more than half a century the trains of the Furka line climbed over the Alps instead of under them, and today steam engines do so again. The Furka mountain section runs about 18 km from Realp in the canton of Uri, over the watershed and down to Gletsch and Oberwald in the upper Rhône valley in Valais. Its highest station, Furka, sits at 2,160 metres, making it one of the highest rail crossings in Europe, and the route alternates between ordinary adhesion track and Abt rack sections as steep as about 11 per cent, with a 1,874-metre summit tunnel beneath the pass.
Construction began in 1911, stalled during the First World War, and the line finally opened in 1925 as part of the Furka Oberalp railway. It was always a struggle. Avalanches made the route impossible in winter, so every autumn the overhead wires were taken down, the tunnel portals shut with gates, and the Steffenbach bridge was folded away out of reach of the avalanches, only to be reassembled after a winter lasting nearly seven months. When the Furka Base Tunnel opened in 1982 the mountain section was abandoned, and by law it should have been dismantled.
Railway enthusiasts stopped that from happening. An association formed in 1983 and an operating company in 1985, and volunteers from Switzerland, Germany and the Netherlands began rebuilding the line section by section: passenger trains returned to Tiefenbach in 1992, reached Gletsch in 2000 and Oberwald on 12 August 2010. Almost all the work, from track maintenance to driving the engines, is still done unpaid. Several of the locomotives have remarkable stories of their own: rack engines built in Winterthur in 1912–13 for the original Furka railway were sold to Vietnam after electrification and rescued from sheds on the Tháp Chàm–Đà Lạt line in 1990, then restored and brought home to climb the Furka once more.
The pleasure of the ride lies in slowness and noise: the bark of a rack locomotive working hard on the grade, the views over the Reuss valley on the Uri side, the stone viaducts such as the one at Steinstafel, and the descent into the Rhône valley past Gletsch.
Getting there
Both ends of the line, Realp and Oberwald, are stations on the Matterhorn Gotthard Bahn between Andermatt and Brig, so the steam railway is easily combined with an ordinary train trip. The nearest larger towns by straight-line distance are Domodossola in Italy (about 50 km) and, within Switzerland, Kriens near Lucerne (about 53 km); the nearest airport is Lugano (LUG), about 75 km away.
Plan your visit
We have no confirmed visit data yet. Once it is confirmed, this block also carries the date it was checked.
Nearby places
- Furka Pass 4.4 km · mountain-pass
- Gelmerbahn 7.1 km · funicular
- Gotthard Pass 15.3 km · mountain-pass
- Titlis Rotair 23.7 km · aerial-tramway
On these lists
From the encyclopaedia
The Furka Steam Railway is a largely volunteer-operated heritage railway which operates a partially rack and pinion-operated line across the Furka Pass, between Realp in Uri and Oberwald in Valais. Culminating at 2,160 metres (7,087 ft), above sea level, it is an old mountainous section of the Furka Oberalp Bahn (FO) that was abandoned after the construction of the Furka Tunnel. It has been gradually brought back into service by the Verein Furka-Bergstrecke with the use of only steam locomotives, with the entire line completed in 2010. As a result, the nearly 18 kilometre-long Furka Railway is the longest operated unelectrified line in Switzerland. It is also the second highest rail crossing in Europe, after the Bernina Railway. The Uri side of the line also constitutes the highest railway in Central Switzerland.
Wikipedia · CC BY-SA 4.0
46.56139, 8.36194per Wikidata